top of page

PROJECTS

Pakxong Substation and Transmission line

The construction of a combined more than $400 million power transmission line connecting Cambodia to Laos and the Thai border. This was a 500-kilovolt transmission line investment project from Phnom Penh to the Cambodia-Laos border and a 500-kilovolt transmission line from Battambang to the Cambodian-Thai border. 

Xayabury Power Dam project

The Xayaburi Dam is a run-of-river hydroelectric dam on the Lower Mekong River, approximately 30 kilometres (19 mi) east of Sainyabuli (Xayaburi) town in northern Laos. The main purpose of the dam is to produce hydroelectric power, 95% of which is to be purchased by the Electricity Generating Authority of Thailand (EGAT). The Xayaburi Dam is the first of the 11 dams planned on the lower Mekong.

Namlik Power Dam Project

Nam Lik 1-2 is located on the main stream of the Nam Lik River, to the north-west of the capital of Laos, Vientiane. The dam is located in Mueng Fueng, and the river flows downstream through the Hin Heup district, where it joins the Nam Xong to form the Nam Ngum. This flows into the Mekong River, downstream of Venetian.

The project has an installed capacity of 100 MW and is equipped with two 50 MW Francis turbines, which are coupled with 58 MVA generators. 

bottom of page